Richland Senior Housing

Project Details

  • Property Location:
    Ellettsville, Indiana
  • Closing Date: July 2021
  • Number of Units: 161
  • Number of Buildings: 19
  • Number of Stories: 
  • Year Built: 1977-2015 and 2021-2022

Unit Interior Renovations

  • Remodel kitchens and bathrooms by replacing select cabinets and countertops;
  • Install new Energy Star appliances in select units;
  • Install new low-flow plumbing fixtures in select units;
  • Install new high-efficiency LED lighting fixtures in select units;
  • Upgrade HVAC systems where needed;
  • New smoke detectors as needed;
  • New bathroom accessories;
  • New floor LVT faux-wood vinyl plank in common areas, bathrooms, and carpet in bedrooms;
  • Repair drywall, patch, and paint;
  • New window coverings as needed;
  • New unit address signs;
  • New hardware on interior and exterior doors;
  • Replace interior doors as needed; and
  • Upgrade baseboards in all common areas that receive new flooring.

Building Envelope and Exterior Renovations

  • Full tear-off and re-roof and replace damaged sheathing at two Buildings in Maple Shades;
  • Masonry exterior replacement and tuckpoint as needed;
  • Replace entry vinyl flooring;
  • Repairs to landings, stairs, and railings as needed; and
  • Improve attic insulation and ventilation.

Site Improvements

  • Repair, seal, and stripe asphalt parking;
  • Improvements to landscaping;
  • Repair and upgrade damaged concrete walkways;
  • Clean gutter drainage lines from buildings, replacing as needed;
  • Install new exterior building and directional signage;
  • Install new property monument sign;
  • Install a common barbeque area;
  • Improve site lighting on grounds and around buildings;
  • Make repairs/improvements to trash dumpster surrounds; and
  • Improve the security camera system.